Certified Maintenance & Reliability Professional (CMRP) Practice Exam

Disable ads (and more) with a membership for a one time $2.99 payment

Prepare for the Certified Maintenance and Reliability Professional Test with flashcards and multiple-choice questions. Understand the exam structure, practice with explanations and hints, and get ready for certification success!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


What is the final step in constructing a fishbone diagram?

  1. Brainstorm potential causes

  2. Develop a corrective action plan

  3. Select root causes

  4. Document all causes

The correct answer is: Develop a corrective action plan

The final step in constructing a fishbone diagram is to develop a corrective action plan after identifying the root causes. Once the potential causes of a problem have been systematically brainstormed and documented within the fishbone structure, the next logical progression is to analyze these causes to identify which ones are the most significant contributors to the issue at hand. This leads to the selection of root causes, which serve as the focus for improvement efforts. Developing a corrective action plan is essential because it translates the insights gained from the fishbone diagram into actionable steps that can address the identified root causes. This plan outlines specific actions to eliminate or mitigate these causes, ensuring that the problem does not recur. This step is crucial for effective problem-solving within maintenance and reliability contexts, where the goal is to enhance overall operational performance. By focusing efforts on concrete actions based on a thorough analysis of root causes, organizations can foster continuous improvement and reliability in their processes.